Chad
Remember the X-15 dropped the rudder off to land. This would have
disqualified them
Blow this troll off.
Big John
On Fri, 14 May 2004 23:37:32 GMT, Chad Irby wrote:
In article . net,
"Steven P. McNicoll" wrote:
The X-15 had turnaround times less than two weeks.
It did, after some lower and slower flights.
Not after the high-altitude flights, though, and the average gap between
"hard" flights of the same airframes was a month and a half.
They also had a tendency to need major parts of the airframe (tail and
wing surfaces) replaced or refurbished after the more demanding flights.
Not to mention they were doing this with a much smaller payload.
|