"Ron Rosenfeld" wrote in message
news

I would have assumed this was a "radar vectors to final" situation and
queried ATC to verify, since they didn't use the magic words that I
understand to be necessary for me to assume radar vectors.
Why would you have assumed it was a "radar vectors to final" situation if
they didn't use the magic words that you understand to be necessary to
assume radar vectors? You're not being vectored in this situation, that
should be clear.
But ATC has had
me lined up with the FAC for quite some distance; I've been in radar
contact; I've been assigned an appropriate altitude to intercept the GP
from below; I've not crossed any IAF prior to DEPRE.
The approach controller did nothing to line you up with the FAC. He simply
told you to intercept the FAC as your previous clearance of direct GRB
VORTAC crossed it some fifteen miles from the LOM at a shallow angle.
If that confirmation is not forthcoming, then I would inform ATC that I am
obliged to execute a procedure turn at DEPRE. I would maintain my last
assigned altitude of 3000' until crossing DEPRE.
And when they informed you that you weren't being vectored you'd proceed to
fly the PT turn, which upon completion you'd be in the exact same position.
Of course, that wouldn't happen. Upon informing ATC you felt obligated to
fly the PT they'd vector you out of the way of the following traffic. Then
they'd either vector you back to the FAC, which would prohibit flying the
PT, or send you direct to the IAF so you could happily fly your PT without
endangering anyone else.