Thread
:
Salto Tooling.
View Single Post
#
2
December 18th 09, 02:39 PM posted to rec.aviation.soaring
Andreas Maurer
external usenet poster
Posts: 345
Salto Tooling.
On Thu, 17 Dec 2009 22:34:51 -0800 (PST),
wrote:
Andreas,
How many people were needed to build Salto in what time span?
Was the cost of materials about $10-15 thousand or more?
If I remember correctly, we needed about three people (part-time) to
build one Salto per month.
The main problem with the Salto was that the female molds left a lot
to be desired - especially the wings needed a lot of work to fit them
to the fuselage. Therefore the finishing needed forever.
The cost of materials was in the $15.000 range.
Andreas Maurer
View Public Profile
View message headers
Find all posts by Andreas Maurer
Find all threads started by Andreas Maurer