Thread: ASK 21 Question
View Single Post
  #2  
Old June 3rd 12, 05:51 AM posted to rec.aviation.soaring
aerodyne
external usenet poster
 
Posts: 63
Default ASK 21 Question

On Jun 2, 5:44*pm, wrote:
The glider is due for a 3000 hour inspection. Schleicher requires the control surfaces to be checked for mass balance as a part of the inspection program.

Regarding the monel question, did I just order the wrong rivets?
Chuck


When in doubt, either drive to the airport to get the manual, or email
the factory and dealer for the correct info. RAS is a poor source for
approved data.

If it is a 3k inspection is that not per a factory S/B? if so it may
be on line.

In general drilling out a monel blind with a steel core is less fun
than Alum. YMMV

aerodyne