View Single Post
  #41  
Old March 27th 14, 04:54 PM posted to rec.aviation.soaring
Soartech
external usenet poster
 
Posts: 268
Default Help needed re Mifflin wind turbines

On Thursday, March 27, 2014 12:22:52 PM UTC-4, wrote:
On Thursday, March 27, 2014 12:06:12 PM UTC-4, Sean Fidler wrote:

http://www.mifflincompplan.com/2014m...aft2.21.14.pdf Not a word about bird impacts or safety concerns in here. Might be a good place to start engaging them.




Interesting read.

Note B5 with respect to slope in area of installation. This might well preclude installation at ridge top.

FWIW

UH


No, I think it says that the land can ONLY be on a ridge top (flat). Here is the text:
5. No (wind energy facility) shall be located on a lot of record containing slopes equal to or exceeding 15% on 50% or more of the lot of record. This standard shall apply to each lot where a Primary Wind Energy Facility extends across multiple lots of record.