Thread: JS3 chatter
View Single Post
  #19  
Old December 13th 16, 10:22 PM posted to rec.aviation.soaring
[email protected]
external usenet poster
 
Posts: 190
Default JS3 chatter


Would be interested to know details of four tubing connector fittings required to "plumb" the probes in the tail each assembly and disassembly sequence. Surely its not a "press tubing onto a barbed in-line connector" process. Thinking it would be a two person job...one to balance the horizontal and the other to connect the fittings.
Better yet...you assemble once at beginning of contest, tie out every night, and disassemble once at end of contest. Awh... the convenience of good weather, a sustainer, poly paint, and good covers.