Thread
:
How long before /G required for IFR?
View Single Post
#
94
February 28th 05, 01:16 AM
Newps
external usenet poster
Posts: n/a
wrote:
On Sun, 27 Feb 2005 20:58:46 GMT, "Chip Jones"
wrote:
Far more likely you swivel-heads will get the few AFSS guys who actually are
qualified controllers. Ironic, too, in a twisted FAA way.. After all, the
69 Level 2-3 VFR towers will be the next part of the NAS auctioned off to
the low bidder, followed by Level-Three up-down terminal facilities. Those
few AFSS people who get picked up in air traffic will be job-hunting again
in about five years, along with a whole bunch of terminal 2152's. Serco or
Lockmart is headed your way right around 2010 or so.
Chip, ZTL
Boy, would I love to read this translated into English.
Translation:
Nobody works here so I can't get a day off. Nobody else CAN work here
because it's so godawful difficult. Pity me.
All of which is BS.
Newps