Andrew Gideon wrote:
I learned that full use of the GDL-69 is expected after the WAAS
uprade. I gathered that this was because the current 430/530 hardware
cannot handle the all of the 69's data for performance reasons, but I
didn't bother to confirm this.
Doesn't surprise me, the rumor is that both their using the same
engineering group that already did these for the formerly-UPSAT
product.
|