![]() |
| If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|||||||
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
Although I asked the A&P to add a lifting point to my A-65 when it was
in the shop, he didn't do it, so I plan on adding one myself. Assume the bolts are long enough to take the added thickness of the lifting point. Action will involve removing two bolts and retorqing them. But it's not simply retorquing those two bolts. There is a sequence to tightening these bolts. I certainly don't plan on loosening any more than two bolts, so do I really need to tighten them in sequence? It doesn't seem practical. Thoughts? Comments? - Mike |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| lifting off... | Richard Lamb | Home Built | 0 | May 17th 04 06:57 AM |
| Germany Lost the War... So What? | robert arndt | Military Aviation | 55 | February 26th 04 09:51 AM |
| How fast should an ADF point? | Ben Jackson | Instrument Flight Rules | 6 | November 21st 03 04:50 AM |
| Reaming needed on aft wing attach point. | Boelkowj | Home Built | 0 | November 7th 03 02:30 AM |
| USAF = US Amphetamine Fools | RT | Military Aviation | 104 | September 25th 03 04:17 PM |