![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#9
|
|||
|
|||
![]() "Larry Dighera" wrote in message ... [good links snipped, although some of the links were dead] Larry, thanks a lot for taking the time to post all of those links. Like I said, Boeing's ATC moves are conceptual in nature. Except for the new "Flow Control" bid this summer, Boeing has been very quiet on *actual* ATC plans and nascent ATC technology since 2001. That was the year the FAA 10-year OEP seriously embarrassed Boeing. That was the summer that FAA announced specific, actual steps for ATC modernization over this decade. At the same time, Boeing could not produce any evidence of either a specific plan or a specific technology to accomplish the vaporous ATC "improvement" goals their quest for a *non-competitive contract* would "produce". Boeing claimed that their plan and the technology to make it work was "secret and proprietary". To most of us in the system, that was code for "we don't have a plan, we don't even have the technology yet to develop a plan, but throw us a contract anyway and we'll make it work..." I'd also like to point out that the consortium of contractors that Boeing is putting together to make a run on a Central Flow Control contract is not the same as providing contract ATC services. Central Flow doesn't control airplanes, it is staffed with displaced weenies from flight service stations and terminal environments who don't have a clue about the actual nuts and bolts mechanics of enroute air traffic control, and it breaks down early and often every year. It's about the biggest collection of egg-headed FAA management want-to-be's in the whole NAS. If Boeing and friends can clean all of those strap hangers out the central command bunker, more power to them. FAA ought to let Boeing take over running all of the Regional offices too. We have over 600 enroute CPC "controllers" working as "traffic management coordinators" in the system right now. We have over 900 CPC "controllers" working as air traffic office staff in the various Regional offices, Hubs, and ARTCC's. Let Boeing run the offices and the command center. Then we could ship those FAA central flow and office staff "controllers" back out to the embattled field facilities, head set in hand, to do the actual job they are getting top tax dollar to perform. Chip, ZTL |
Thread Tools | |
Display Modes | |
|
|