A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Soaring
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

Let's talk ground launching........



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #16  
Old September 2nd 05, 02:35 PM
Chris Nicholas
external usenet poster
 
Posts: n/a
Default

Yes, you need a drogue, at least for piano wire cable. If not, it drops
into a terrible snarl-up. Dyneema/Spectra, I don't know - ask people who
have tried it.

For lengths and hardware on the cable, I have seen many different
variations. The most complex was at Dunstable, UK some years ago, which
included many features for which I could understand the reason,
including a long shock rope between drogue and rings. I believe that the
safest arrangement is short (2-6 feet), plastic-tube-covered strop from
Tost rings to Tost weak link; weak link with easy-change connections;
long strop (30-80 feet) from weak link to drogue (to keep billowing
drogue well in front of glider in a power failure situation); swivel;
and then main cable.

It is an official BGA "Recommended Practice" that the shock rope should
be stiffened with plastic hose or similar, to prevent it wrapping round
the wheel axle and being unable to release. There are, however, many
more aspects of the hardware that could usefully be standardised, or at
least listed for guidance so that if people do something different it
should be a conscious decision with good reason, not just ignorance or
lack of experience.

No doubt someone from Dunstable will correct the following if I got it
wrong or it has changed, but my notes of their assembly were as follows,
starting at the glider end:

1. Tost rings

2. wire rope a few feet long.

3. ferrule to secure end of 2 into a loop.

4. plastic hose over 2.

5. ferrule to secure other end of 2 into a loop.

6. oval link with flat section on one side.

7. quick-release hook mating with 6.

8. shackle.

9. weak link assembly.

10. shackle.

11. shock rope about 80 feet long.

12. shackle.

13. triangular ring on end of drogue.

14. drogue.

15. metal end fitting on drogue.

16. shackle.

17. plate on shackle to take the wear.

18. swivel.

19. shackle.

20. oval link with flat section on one side.

21. quick-release hook mating with 20.

22. loop of main winch cable.

23. first ferrule securing 22.

24. plate on loop to take the wear.

25. second ferrule securing 22 and 24.

Most of the hardware is standard off-the shelf stuff. The "plate . . .
to take the wear" looked like a special, and it was oval, about 2x3
inches and 1/4 inch thick (50x75 mm, 6 mm thick) and had two holes
through which the legs of the shackle projected. It had the effect of
being the largest diameter thing on the assembly, so would be the one to
take the wear from running over the ground, hence protecting swivel
etc..

I hope this helps.

Chris N.








__________________________________________________ _________
Yahoo! Messenger - NEW crystal clear PC to PC calling worldwide with voicemail http://uk.messenger.yahoo.com



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Got my ground instructor ratings Yossarian Piloting 7 July 6th 05 02:21 AM
Switching to ground.... David Rind Piloting 85 April 16th 04 06:53 PM
ADV: CPA Mountain Flying Course 2004 Dates [email protected] Piloting 0 February 13th 04 04:30 AM
Wing in Ground Effect? BllFs6 Home Built 10 December 18th 03 05:11 AM
Antenna Ground Plane Grounding Fastglasair Home Built 1 July 8th 03 05:21 PM


All times are GMT +1. The time now is 01:56 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.