A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Soaring
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

soaring into the future



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old December 26th 07, 06:04 PM posted to rec.aviation.soaring
Marc Ramsey[_2_]
external usenet poster
 
Posts: 211
Default soaring into the future

Shawn wrote:
From this site:
http://www.advancedcompositetraders.com/html/news.html

Fiber placement and tape laying

The fiber placement process automatically places multiple individual
pre-impregnated tows onto a mandrel at high speed, using a
numerically controlled placement head to dispense, clamp, cut and
restart each tow during placement. Minimum cut length (the shortest
tow length a machine can lay down) is the essential ply-shape
determinant. The fiber placement heads can be attached to a 5-axis
gantry or retrofitted to a filament winder or delivered as a turnkey
custom system. Machines are available with dual mandrel stations to
increase productivity. Advantages of fiber place~ ment fabrication
include speed, reduced material scrap and labor costs, parts
consolidation and improved part-to-part uniformity. The process is
employed when producing large thermoset parts with complex shapes.

Tape laying is an even speedier auto~ mated process in which
prepregged tape, rather than single tows, is laid down con~
continuously to form parts. It is often used for parts with highly
complex contours or angles. Tape lay up is versatile, allowing breaks
in the process and easy direction changes. Capital expenditures for
computer-driven, automated equipment can be significant, however.
Suitable for both simple and complex parts, tape laying is the
current method of choice for wing skin panels on the F-22 Raptor
fighter jet.


As I said before, this would be farmed out to a subcontractor who's
already made the capital investment, unless the glider world sees really
amazing growth.


Given the competing customers for production time in such facilities, I
tend to doubt that "low cost" is being given much attention. But, in
any case, the only way to produce future gliders for an affordable price
will be through innovative manufacturing techniques...

Marc
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Colorado Soaring Pilots/SSA Governor 2007 Seminar and 2006 Soaring Awards Banquet Frank Whiteley Soaring 0 February 15th 07 04:52 PM
The Soaring Server is dead; long live the Soaring Servers John Leibacher Soaring 3 November 1st 04 10:57 PM
Possible future legal problems with "SOARING" Bob Thompson Soaring 3 September 26th 04 11:48 AM
Soaring Server/Worldwide Soaring Turnpoint Exchange back online John Leibacher Soaring 0 June 21st 04 05:25 PM
Soaring Server - Worldwide Soaring Turnpoint Exchange John Leibacher Soaring 0 June 19th 04 04:57 PM


All times are GMT +1. The time now is 08:04 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.