![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#5
|
|||
|
|||
![]()
Wicks aircraft catalog gives two values for 4130:
min tensile (breaking) 95,000 and min yield (where it starts distorting) 75,000. Usually the initial yielding will have quite a bit of strength giving you a chance to get back down. But repeated cycles will weaken it and rupture. Check the structure for any cracks and fix it. ---------------------------------------------------- Paul Lee, SQ2000 canard project: www.abri.com/sq2000 Philippe Vessaire wrote in message -moi... Hello, when I read 90,000 lb/sqi for strength, is it just before the part is broken or is it the elastic limit? Thanks |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Welding techniques for 4130? | Building The Perfect Beast | Home Built | 29 | September 4th 03 08:52 PM |
4130 frame? | Steve Thomas | Home Built | 23 | August 27th 03 05:50 PM |