A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Soaring
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

Short Wings Gliders



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #11  
Old February 4th 09, 01:44 AM posted to rec.aviation.soaring
Brad[_2_]
external usenet poster
 
Posts: 722
Default Short Wings Gliders (25)

On Feb 3, 5:07*pm, Uncle Fuzzy wrote:
On Feb 2, 6:28*pm, Brad wrote:





On Feb 2, 6:15*pm, Nyal Williams wrote:


This comes from EAA, IIRC. In the US, about 5% of the homebuilt aircraft
started up ever get finished. *Of those that do, many pass through three
owner/builders during the course of the completion, and the process
usually takes about eight years. * Of course, gliders are much simpler to
build.


Bill Piper was famous for saying, and I paraphrase, "It costs as much to
build a bad design as a good one. *Tell me the weight of an airplane and I
can tell you how much it costs to build it."


This formula would probably be true for any [X]RP structure in any
particular location and with any particular construction method.


At 01:31 03 February 2009, Bob Kuykendall wrote:


On Feb 2, 3:27=A0pm, (Michel Talon) wrote:


I agree with all you said, but i don't think this model is
sustainable.


Michel, I do agree with you in that as well; in the greater scheme of
things the way sailplane manufacturers have operated cannot continue
indefinitely. However, I don't think that how they are operating is
damaging to the sport of soaring or to the worldwide community of
soaring pilots, so I do think it is my place to tell them how to run
their businesses. I can, of course, think of ways that they could do
more to benfit the sport and its enthusiasts, but only at the cost of
damage to their profitability. But again, it is their business, not
mine.


Getting back to your point, there is one thing that the 19th century
robber barons got right when they used social darwinism to justify
their avarice and greed: natural selection in the business environment
will force businesses to adapt or to evolve, and those that do neither
can be counted upon to wither and die. So I think that if their
current business model is not sustainable, then the manufacturers will
develop one that is, or will leave the business altogether.


Gliding is still living because there has been tens of thousands
of people learning to fly in Germany, Brittany, France, etc. for
*small
cost*, thanks to the dedication of instructors doing that for free,
over
all those years...


If only we could get those tens of thousands of people to spend a few
days each building gliders. If, for example, 10000 people spent three
workdays (24 hours) building gliders, that'd be enough labor to
produce 120 training gliders or about 180 single-seaters.


Of course, you can't do that with a glider factory, the logistics of
transporting and accommodating that many temporary workers at a single
facility would be a nightmare. But if you look closely at the world of
homebuilt aircraft that is very nearly what you see, with thousands of
distributed "manufacturing centers" in tiny workshops all across the
world. Of course, instead of thousands of people spending a few hours
each what we have is hundreds of people spending a thousand hours
each, but I think it can work the other way as well.


Thanks again, Bob K.- Hide quoted text -


- Show quoted text -


imagine then, being the one who designes the craft, builds the plugs,
tools, parts, systems and then assembles the whole
thing...............then spends about the same amount of time it took
to build the craft painting and polishing it.


Brad- Hide quoted text -


- Show quoted text -


Brad,
* That comment brought a mental chuckle... The last Control Line
Precision Stunt plane I built was over 35 years ago. *It took 42 hours
to build the airframe, and over 120 hours for the covering and
finish. *This was a plane of around 500 square INCH wing area.- Hide quoted text -

- Show quoted text -


ah, I remember those days too. mine never lasted long enough to
justify spending too much time with covering/painting. we used to
build voodoo's and nemisis' and smash em up pretty regularly. it was a
lot of fun making the pressure tanks out of pudding cans and
pacifiers! nothing like the sound of a 36XBB at full speed!

Brad
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
X-Wings and Canard Rotor Wings. Charles Gray Rotorcraft 1 March 22nd 05 12:26 AM


All times are GMT +1. The time now is 11:53 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.