![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#16
|
|||
|
|||
![]()
In message , Kevin Brooks
writes "Paul J. Adam" wrote in message ... Some flight and drop tests would help turn the notional "capability" into operational utility... so when were they carried out? Ask the USAF. I've checked their website and searched elsewhe best I could do was a five-year-old plan that had JDAM test drops sometime after 2000. Unfortunately I don't have any personal contacts there to tap. I trust them a bit further in this regard than I do the peanut gallery. I've only *done* weapon system acceptance and integration, so what do I know? I know this for su all "capable" means is "has not been proved impossible". The software that is capable of handling the JDAM has been flying for a couple of years now; Arnold has done wind tunnel tests of the separation characteristics, and the F/A-22 was listed as one of the platforms to receive clearance in a fact sheet dated June 03 ( www.af.mil/factsheets/factsheet.asp?fsID=108). Even Mr. Cook has acknowledged that dummy drop tests were conducted. When, where and how many, out of interest? There seems to be a paucity of data, and nobody's either claimed clearance or projected a date when it will be achieved. Let's see--software is in place, dummy tests have been conducted...yep, seems like it is indeed capable of delivering the puppy. No. I don't tell you combat engineering, you don't tell me how to integrate weapons onto airframes. "Software in place" is relatively straightforward when the weapon's in use elsewhere and the software is developmental: "dummy tests conducted" can be as simple as "flew with a blivet" or "conducted one safe jettison from safe, slow and level" and certainly does not imply "cleared for operational use". The USAF says the F/A-22 will be able to carry JDAM's when it enters into operational front-line service with 1st TFW--if you disagree, take it up with them. When was the clearance signed? If it hasn't been signed, when is it expected? Been there, done that, got the T-shirt, still have the scars. "Will be able to carry" has been translated as "is able to carry, but not safely drop or jettison, inert training versions" for contract acceptance in the past when an aircraft program was under pressure. The USAF don't seem to be saying it very clearly or very loudly: while there's no reason to believe it impossible, neither is this blind acceptance that the Raptor is currently a fully-capable JDAM-dropper reasonable. -- When you have to kill a man, it costs nothing to be polite. W S Churchill Paul J. Adam MainBoxatjrwlynch[dot]demon{dot}co(.)uk |
Thread Tools | |
Display Modes | |
|
|