![]() |
| If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|||||||
|
|
Thread Tools | Display Modes |
|
#1
|
|||
|
|||
|
2 things:
1) Does anyone have a detailed guide or notes on placement of turbulator tapes on the ASG29? 18 meter is the priority, 15 meter sections would be nice to have. I am also looking for an inventory list of what size, brand, type of seals and t tape to buy, etc. 2) Does anyone have an electronic copy of the flight manual? John Murray is working on ordering a seal "kit" from Schleicher. But I wondered if anyone had taken this a step further... Thanks in advance, Sean 7T |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Cad drawing for ASW27 or ASG29 instrument panel | Larry Goddard | Soaring | 16 | December 30th 18 08:19 PM |
| FS ASG29-18 price reduced | Sam Zimmerman | Soaring | 0 | January 25th 13 05:18 PM |
| ASG29 for sale | [email protected] | Soaring | 8 | June 29th 07 02:00 AM |
| Needed Ventus 2Cx or ASG29 for EGC France 2007 | Andy Smielkiewicz | Soaring | 1 | February 18th 07 01:41 AM |
| FS; ASG29 option | pat | Soaring | 2 | August 31st 06 11:30 PM |