A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Soaring
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

JS3 chatter



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #10  
Old December 13th 16, 10:22 PM posted to rec.aviation.soaring
[email protected]
external usenet poster
 
Posts: 190
Default JS3 chatter


Would be interested to know details of four tubing connector fittings required to "plumb" the probes in the tail each assembly and disassembly sequence. Surely its not a "press tubing onto a barbed in-line connector" process. Thinking it would be a two person job...one to balance the horizontal and the other to connect the fittings.
Better yet...you assemble once at beginning of contest, tie out every night, and disassemble once at end of contest. Awh... the convenience of good weather, a sustainer, poly paint, and good covers.

 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Cockpit Chatter and Groundcrew Gripes Andie Ankey-Upcuff General Aviation 1 June 9th 05 02:57 AM


All times are GMT +1. The time now is 09:06 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright 2004-2025 AviationBanter.
The comments are property of their posters.