A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Piloting
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

Hobbs



 
 
Thread Tools Display Modes
  #41  
Old July 5th 07, 02:45 PM posted to rec.aviation.piloting
Gig 601XL Builder
external usenet poster
 
Posts: 2,317
Default Hobbs

Morgans wrote:
"Dave S" wrote

Running the engine on the ground for 40 hours may give you 40 hrs
hobbs time but 0 hours flight time. Having the hobbs wired to the
master could also pad the time significantly, without the engine
even running. Someone could sign off the books and nobody would be the
wiser.. but
you'd only be cheating yourself, if you took your family/friends up
in a plane that wasn't shaken down properly.


Also add that in those 40 hours all systems are to be checked in all
possible circumstances and all different parts of the flight
envelope. The plane is supposed to be evaluated to see what the
limits of the flight envelope are, and an operation manual written,
with all of the applicable V speeds logged in said manual, and
emergency procedures written.
For planes like the RV that have thousands of copies flying, that
might not be too hard to do, but for a plane that is a one-off, or
only has a few copies flying, and likely with different engine and
prop combinations, and with who knows how many slight variations, I
would think nailing down one of these rare airplanes would need all
of the 40 hours, to do the job well.


The FAA has a really good guide for phase one testing. But, so many of the
systems to be checked when following that guide don't exsist on the plane
I'm building that I will be flying a bunch hours inside that 25nm circle
after everything has been tested. Not that I have a problem with that but my
particular 25 nm circle is a little boring. I really kind of wish there was
a 3 phase program. Phase 1 as is, Phase 2 larger or unlimited area without
passengers, and then Phase 3 which would be like the current Phase 2.


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
fwd: For Hobbs Jack Soaring 9 November 26th 06 05:28 AM
Hampton Inn Hobbs, NM Kilo Charlie Soaring 5 July 10th 04 02:03 AM
Hobbs Day 5 7-08 # 711. TomnKeyLargo Soaring 2 July 9th 04 04:14 AM
Hobbs Day 2 7-05-04 TomnKeyLargo Soaring 0 July 6th 04 05:24 AM
LS8-18 FS after Hobbs (USA) SAM AND LEIGH ZIMMERMAN Soaring 1 April 5th 04 12:43 PM


All times are GMT +1. The time now is 11:48 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 AviationBanter.
The comments are property of their posters.