A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Owning
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

Field approval delays



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old May 4th 07, 03:23 PM posted to rec.aviation.owning,rec.aviation.piloting
Jim Burns[_2_]
external usenet poster
 
Posts: 257
Default Field approval delays

Does anyone in the group have any information, experience, or links to
documentation concerning a recent (past 6 months) change in Field Approval
Guidance for FSDO Inspectors requiring that they seek FAA engineering advice
and guidance, but not necessarily DER approval, on each and every field
approval no matter what level of documentation, testing, or experience the
applying A&P or FSDO Inspector has regarding the major change or alteration?

I'm not referring to the new requirement to pass on a copy of the 337 to
Oklahoma City, nor am I referring to the substitution of a previously TSO'd
part with a non-TSO'd part. My question arises from a recent conversation
with a A&P/IA friend who has recently ran into problems and delays for
multiple field approvals. He's working with the same FSDO inspector that he
has used for years, with whom he has a great relationship. Several of the
changes were simple alterations or installations, and several where
identical to other field approvals in like make and model which he breezed
through just last fall.

The FSDO Inspector is telling him that all new directives coming down from
Washington are forcing all field approvals onward to engineering for their
approval before the local inspector is being allowed to sign off. Many
times the paperwork simply disappears forcing the FSDO guys to make multiple
inquiries about it's progress and even requiring the submitting A&P to
reapply. The FSDO inspectors are rumored to be mad as hell about it and
feel that their judgment and experience has been tossed by the wayside.

Can anybody shed any light on this?

Jim


 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Field approval delays Jim Burns[_2_] Piloting 9 May 9th 07 10:24 PM
Field Approval Based Upon A STC! NW_PILOT Owning 2 January 30th 06 09:52 PM
Delays getting into Newark International? Go VFR. Peter R. Instrument Flight Rules 2 December 24th 05 04:16 PM
Medical delays Guy Elden Jr Piloting 9 July 27th 05 04:57 PM
IFR to & from CLT - Delays and Fees to Expect David Instrument Flight Rules 6 August 21st 04 04:57 AM


All times are GMT +1. The time now is 01:17 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 AviationBanter.
The comments are property of their posters.