![]() |
| If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|||||||
|
|
Thread Tools | Display Modes |
|
#6
|
|||
|
|||
|
"Helowriter" wrote in news:1111155479.986630.189070
@l41g2000cwc.googlegroups.com: The Merlin in the UK was delivered five years late and 1.6 billion pounds over budget, and Lockheed Martin was the systems integrator. If we're to believe recent news, the F-22 and JSF are way, way, way over budget with no end in sight. Oh, the phrase "cost overrun" was actually coined for a Lockheed program -- the C-5 Galaxy. Comanche. |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Flying high: Lockheed wins presidential helicopter contract | [email protected] | Naval Aviation | 11 | February 8th 05 03:20 PM |
| Flying high: Lockheed wins presidential helicopter contract | [email protected] | Rotorcraft | 0 | January 30th 05 04:48 AM |
| Lockheed wins Presidential helicopter contract | Tiger | Naval Aviation | 0 | January 29th 05 06:24 AM |
| Musings of a Commercial Helicopter Pilot | Badwater Bill | Home Built | 6 | February 27th 04 10:11 AM |
| Musings of a Commercial Helicopter Pilot | Badwater Bill | Rotorcraft | 0 | February 25th 04 07:39 PM |