![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Display Modes |
#28
|
|||
|
|||
![]()
Got our invoice for the Aztec's maintenance, repair, windshield install, and
annual inspection right in front of me... 1. Cleaned and gapped plugs... owners did this 2. RE Comps 72/80 76/80 74/80 74/80 74/80 76/80 450 SMOH LE Comps 72/80 72/80 76/80 76/80 72/80 72/80 1750 SMOH 3. Complied with SB CE-04-88 Inspection of Tail torque tube 4. Installed new mag bearings & gaskets on left engine 5. Reinstalled shims on flap torque tube 6. Installed one piece windshield (group effort, about 15 A&P hours) 7. Installed new left engine alternator belt, required pulling the prop... owners did this 8. Installed new Hyd., Air, and Vacuum Filters... owners did this 9. Cleaned fuel injectors... owners did this 10. C/W all AD's 11. Annual Inspection Total A&P labor 39.5 hours $2172.50 Total Parts $141.55 Tax $127.27 Grand Total $2441.32 Like Jim W. pointed out, most of this is not the Inspection but needed repairs and regular maintenance items. Owners did all disassembly and reassembly, most of the A&P labor was for the new windshield install, approximately 24 of the 39.5 hours. Rest of the A&P labor was for Comp checks, helping to remove and reinstall the horz. stab., install mag bearings and gaskets, time mags, install flap torque tube shims, re-build flap actuator arm guide, annual inspection, bookwork, and helping us do miscellaneous things. Owners also did the engine wash-downs, engine oil/filter changes, all lubing, and repacking the wheel bearings. Jim |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Christmas Annual - long drivel | Denny | Owning | 23 | December 31st 04 08:52 PM |
My Aztec's first Annual | Louis L. Perley III | Owning | 11 | November 11th 04 05:04 AM |
Annual Report Final. "Long" | NW_PILOT | Owning | 20 | October 28th 04 07:20 PM |
Annual Report Final. "Long" | NW_PILOT | Piloting | 22 | October 28th 04 07:20 PM |
Annual Costs - Take the Pledge | Roger Long | Owning | 25 | February 1st 04 03:41 PM |