A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Soaring
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

§ 61.87 (i)



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #26  
Old October 16th 20, 10:38 AM posted to rec.aviation.soaring
[email protected]
external usenet poster
 
Posts: 148
Default § 61.87 (i)

On Thursday, October 15, 2020 at 8:27:02 AM UTC-7, Piet Barber wrote:
From the FAA Glider Flying Handbook, page 6-2 (8083-13A, the current edition):
“The assembly of a glider to include the installation of glider wings and tail surfaces is classified as operations functions not preventative maintenance.
This information can be found in Amendment 43-27, published in 52 FR 17276, May 6, 1987 which is an amendment to 14 CFR part 43.”
The FAA considers that training in assembling a glider is part of the mandatory glider pre-solo training requirements in CFR 61.87(i)(13). Therefore, it not a part 43 preventative maintenance action which would require a logbook entry, but a normal operational action and no logbook entry is required.



Another argument is that the glider POH, FAA-approved procedures for the pilot to follow, contains instructions on how to assemble and disassemble the glider.
 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT +1. The time now is 12:19 AM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright 2004-2025 AviationBanter.
The comments are property of their posters.