A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Home Built
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

I want to build the most EVIL plane EVER !!!



 
 
Thread Tools Display Modes
  #1  
Old December 2nd 05, 08:39 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!


"Dennis Fetters" wrote in message
m...
I should, I wrote it! But you're the one that made the false accusation
and can't back it up.


I'll round it up.

In the meantime, do you want to tell us how many hours you had on your
prototype, not the Cicare prototype you took to Oshkosh, before you started
selling your helicopters? I know this is the kind of questions that make
you squirm, Dennis.




  #2  
Old December 2nd 05, 09:35 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

C.D.Damron wrote:
"Dennis Fetters" wrote in message
m...

I should, I wrote it! But you're the one that made the false accusation
and can't back it up.



I'll round it up.

In the meantime, do you want to tell us how many hours you had on your
prototype, not the Cicare prototype you took to Oshkosh, before you started
selling your helicopters? I know this is the kind of questions that make
you squirm, Dennis.



Why don't you just read for yourself sometime?

The first time I took it to Oshkosh it had 0 hours. The second time it
had 210 hours.


Dennis Fetters

Designer of;
Air Command 1/plcs Gyroplanes
Air Command 2/plcs Gyroplanes
Mini-500 1/Plcs Helicopter
Voyager-500 2/Plcs Helicopter
Excalibur 5/Plcs Turbine Helicopter
Star-Lite-A VTUAV Helicopter
Star-Lite-B VTUAV Helicopter
  #3  
Old December 2nd 05, 10:15 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!


"Dennis Fetters" wrote in message
news
The first time I took it to Oshkosh it had 0 hours. The second time it
had 210 hours.

Dennis, in separate posts, you have provided the info required to establish
a timeline that shows you were more concerned with marketing than testing.

In the Summer of 1992, the Mini-500 showed up at Oshkosh, but that aircraft
didn't have its 40 hours flown off yet. Whether this was the first Mini or
not, the timeline suggests that Fetters designed and tested his new design
in a year and half, or less.

Sometime in 1992, brochures were in circulation stating non-engine TBO's of
2000+ hours. By October of 1992, Revolution reported at least 150 orders
had been placed.

I'm not sure when the first Mini-500's shipped, but it is clear that the
sales effort was on before the design was completed and TBO claims were
advertised that had not been tested. By July of 1995, N500ZZ (serial
#0000) only had 200 hours and was by everybody's opinion, the aircraft with
the most time.

Dennis, when Revolution had 150 orders, how many hours did your high time
aircraft have???




  #4  
Old December 3rd 05, 02:40 AM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

C.D.Damron wrote:
"Dennis Fetters" wrote...
The first time I took it to Oshkosh it had 0 hours. The second time it
had 210 hours.


Who left the master switch on?

By July of 1995, N500ZZ (serial #0000) only had 200 hours and
was by everybody's opinion, the aircraft with the most time.


  #5  
Old December 3rd 05, 05:40 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!


"Darrel Toepfer" wrote in message
...
C.D.Damron wrote:
"Dennis Fetters" wrote...
The first time I took it to Oshkosh it had 0 hours. The second time it
had 210 hours.


Who left the master switch on?

By July of 1995, N500ZZ (serial #0000) only had 200 hours and
was by everybody's opinion, the aircraft with the most time.



For Fetters, the history of the Mini-500 starts with the display and demos
of Cicare CH-6 at Oshkosh. He refers to this aircraft as "the prototype",
but in his own posts states that he did not have access to the prototype
after he ended his relationship with Cicare, forcing him to design and test
a helicopter from scratch.

Based on the timeline, Fetters designed a helicopter from scratch in a year
and half after ending his relationship with Cicare, all the while taking
orders based largely on the excitement generated by the earlier CH-6. I
find it an amazing task that a helicopter could be designed, built, and
tested in this timeframe.

If you think that timeframe is a little tight, throw in a 1993 flood that
Fetters has said resulted in delays.

The high-time aircraft had about 200 hours on it by July of 1995.

I DIDN'T THINK OF IT EARLIER, BUT I WONDER WHEN THE FIRST AIRCRAFT WAS
ASSEMBLED AND TESTED USING PRODUCTION PARTS AS THEY APPEARED IN ACTUAL
PRODUCTION KITS.

This is an important question, as many of the problems associated with the
Mini-500 were quality control issues that might have been revealed had
adequate testing been performed on a kit-built aircraft, instead of a
prototype craft where every part is crafted under close scrutiny.






  #6  
Old December 3rd 05, 06:27 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

My observation is:
1. Denise is a good businessman, but not a good designer.
2. Cicarre is a good designer, but not a good businessman.

  #7  
Old December 4th 05, 06:19 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

Flyingmonk wrote:

My observation is:
1. Denise is a good businessman, but not a good designer.
2. Cicarre is a good designer, but not a good businessman.


Everyone has the right to their own opinion, no matter how uneducated it
may be.


Dennis Fetters

Designer of;
Air Command 1/plcs Gyroplanes
Air Command 2/plcs Gyroplanes
Mini-500 1/Plcs Helicopter
Voyager-500 2/Plcs Helicopter
Excalibur 5/Plcs Turbine Helicopter
Star-Lite-A VTUAV Helicopter
Star-Lite-B VTUAV Helicopter
  #8  
Old December 7th 05, 06:34 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

On 3 Dec 2005 10:27:02 -0800, "Flyingmonk" wrote:

My observation is:
1. Denise is a good businessman, but not a good designer.
2. Cicarre is a good designer, but not a good businessman.




Does a GOOD businessman....

1. Run his business into the ground?
2. Keep deposits on undelivered goods?
3. Leave others holding the bag?
4. Open more businesses to repeat the above?


Does a GOOD SALESMAN....

1. Sell a refrigerator to an eskimo,
2. Get the money,
3. Sleep with or marry the eskimo's daughter....
4. NEVER have to deliver the refrigerator.


City Father -
Excelsior Springs, MO
Home of a failed kit helicopter company


  #9  
Old December 4th 05, 06:11 PM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!

C.D.Damron wrote:

"Darrel Toepfer" wrote in message
...

C.D.Damron wrote:

"Dennis Fetters" wrote...

The first time I took it to Oshkosh it had 0 hours. The second time it
had 210 hours.


Who left the master switch on?


By July of 1995, N500ZZ (serial #0000) only had 200 hours and


was by everybody's opinion, the aircraft with the most time.




For Fetters, the history of the Mini-500 starts with the display and demos
of Cicare CH-6 at Oshkosh. He refers to this aircraft as "the prototype",
but in his own posts states that he did not have access to the prototype
after he ended his relationship with Cicare, forcing him to design and test
a helicopter from scratch.



Correct. Mr. Cicare, for whatever reason he had, could not live up to
his end of the deal, forcing me to take on the Mini-500 on my own and
with none of his help or experience, which would have been beneficial.


Based on the timeline, Fetters designed a helicopter from scratch in a year
and half after ending his relationship with Cicare, all the while taking
orders based largely on the excitement generated by the earlier CH-6. I
find it an amazing task that a helicopter could be designed, built, and
tested in this timeframe.



Thank you. It was an incredible amount of work. A challenge of a
lifetime. Testing continued on many years after until we shipped the
first kit, and many years after that until we closed our doors in 2000.


If you think that timeframe is a little tight, throw in a 1993 flood that
Fetters has said resulted in delays.



Right. We even lost our only flying Mini-500, along with all of our
factory equipment, molds and part supplies. We had to start all over,
and move to a new location and outfit it too. Yet, in a year and a half
after, we shipped our first kit. It was a magnificent comeback and
triumph over adversity. Thank you for recognizing this.


The high-time aircraft had about 200 hours on it by July of 1995.

I DIDN'T THINK OF IT EARLIER, BUT I WONDER WHEN THE FIRST AIRCRAFT WAS
ASSEMBLED AND TESTED USING PRODUCTION PARTS AS THEY APPEARED IN ACTUAL
PRODUCTION KITS.



The first Mini-500 I made had 95% of the same parts in it as was in the
finalized machines. We also had a second Mini-500 before shipping, that
was helping in the testing. The design was frozen sometime in early
1995, and tested on until the day we closed.


This is an important question, as many of the problems associated with the
Mini-500 were quality control issues that might have been revealed had
adequate testing been performed on a kit-built aircraft, instead of a
prototype craft where every part is crafted under close scrutiny.



We had some quality control issues, as well as any new company with a
product. Look at the R-22 and R-44 problems, and those were certified
helicopters! We solved our problems, as they did.

If you had some real-earth experience in what you were saying, then you
would not be saying it.


Dennis Fetters

Designer of;
Air Command 1/plcs Gyroplanes
Air Command 2/plcs Gyroplanes
Mini-500 1/Plcs Helicopter
Voyager-500 2/Plcs Helicopter
Excalibur 5/Plcs Turbine Helicopter
Star-Lite-A VTUAV Helicopter
Star-Lite-B VTUAV Helicopter
  #10  
Old December 5th 05, 01:01 AM posted to rec.aviation.homebuilt
external usenet poster
 
Posts: n/a
Default (Mini-500)I want to build the most EVIL plane EVER !!!


"Dennis Fetters" wrote in message
. com...
If you had some real-earth experience in what you were saying, then you
would not be saying it.


You don't have to design and market a helicopter to understand that you
should probably design and test your product adequately before selling it.
Call me old fashioned, but that is how I think it should be done, especially
if lives are at stake.




 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
American nazi pond scum, version two bushite kills bushite Naval Aviation 0 December 21st 04 10:46 PM
Hey! What fun!! Let's let them kill ourselves!!! [email protected] Naval Aviation 2 December 17th 04 09:45 PM
rec.aviation.aerobatics FAQ Dr. Guenther Eichhorn Aerobatics 0 November 1st 03 06:27 AM
Conspiracy Theorists (amusing) Grantland Military Aviation 1 October 2nd 03 12:17 AM
rec.aviation.aerobatics FAQ Dr. Guenther Eichhorn Aerobatics 0 October 1st 03 07:27 AM


All times are GMT +1. The time now is 10:23 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.