A aviation & planes forum. AviationBanter

If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below.

Go Back   Home » AviationBanter forum » rec.aviation newsgroups » Home Built
Site Map Home Register Authors List Search Today's Posts Mark Forums Read Web Partners

Testing Stick Ribs



 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old October 3rd 04, 03:30 AM
smjmitchell
external usenet poster
 
Posts: n/a
Default

Yeap ... go to the FAA web site and then big down till you find a link to
the historical Advisory Circulars (AC's). This will then link you to the DOT
Digital Special Collection or somthing like that.

Just search for AC21-3 when you get there.


"Leon McAtee" wrote in message
om...
"smjmitchell" wrote in message

. au...
This test procedure is overly simplistic and may not test the critical
loading condition of the ribs.



I would recommend the test procedure outlined in AC21-3 Basic Glider
Criteria as a more concise and thorough load test schedule. This method
This publication also provides very detailed instructions on how to

mount
and load the rib.



BTW ... is there a web site where you can download
'Handbook of Instruction for Airplane Designers,' Air Corps, U.S.Army

(circa
1937)
or are you working from a paper copy.



Is there a place where one could down load this "more concise" manual?
A quick Google didn't turn it up.
===============================
Leon McAtee



"Bob Hoover" wrote in message
om...
Rib Testing

The rib is supported upside down by a jig simulating the wing spars.
The load, consisting of a single mass suitably divided by balance
beams, is applied to the upper edge of the rib (as positioned in the



 




Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Heat treating wing ribs Holger Stephan Home Built 13 February 4th 04 12:59 AM
post vs stick hangar construction Joa Home Built 25 November 1st 03 02:03 PM
FA Infinity Military Style Control Stick Grip Terry Ladouceur Home Built 3 October 8th 03 01:52 AM
Torsional Vibration Testing B2431 Home Built 8 July 25th 03 08:15 AM
Stick grips John Nicholson Home Built 17 July 23rd 03 11:13 AM


All times are GMT +1. The time now is 06:26 PM.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 AviationBanter.
The comments are property of their posters.